Pumps


– Supplying QTY (04) multistage pumps 400 m³/hr @ 25 m – Egyptian iron & steel company
– Supplying QTY (06) horizontal split case pumps – 620 L/s @c112 m – Fine Peak Co.
– Supplying QTY (04) horizontal split case pumps 500 m³/hr @ 60 m – Port Said Sea Port Authority.
– Supplying QTY (03) horizontal split case pumps 300 m³/hr @ 30 m – Port Said Sea Port Authority
– Supplying QTY (04) vertical direct coupled sewage pumps 25 L/s @ 40 m – Khedr Contracting Co.
– Supplying QTY (03) vertical direct coupled sewage pumps 400 L/s @ 20 m – Main Haram sewage pumping station – Khedr Contracting Co. – End User: Giza Water Co.
– Supplying & erection supervision of main pumps & motors for Atfeeh WTP – phase 2 – Arab contracting Co. with Construction Authority of potable water (CAPW) – End User: Giza Water Co., consists of:
QTY (02) Horizontal end suction pumps 400 L/s @ 15 m
QTY (02) Horizontal split case pumps 400 L/s @ 75 m
QTY (02) Vertical sludge pumps 200 L/s @ 20 m

– Supplying & erection supervision of main pumps & motors for West Assuit / Nasser City WTP new intake & booster pumping station – Hassan Allam Construction Co. – End user: New Urban Communities Authority (NUCA).

Water Hammering System


– Design, supply & erection of water hammering system for New Cairo Irrigation and transmission lines DN 1500 – 18 km , QTY (08) Tanks – 70 m³  capacity each  – Petrojet  Co. – 

End user: New Urban Communities Authority.

– Design, supply & erection of water hammering system for booster pumping station Galala # 3 – Cairo Contracting Co.

 End user: Egyptian Armed Forces Engineering Authority (EAFEA)

 – Design, supply & erection of water hammering system for WTP Galala # 1 – Concord   Contracting Co.

End user: Egyptian Armed Forces Engineering Authority (EAFEA)

– Design, supply & erection of water hammering system for booster pumping station Galala # 2 – Concord   Contracting Co.

End user: Egyptian Armed Forces Engineering Authority (EAFEA) 

– Design, supply & erection of water hammering system for sewage pumping station Galala # 3 – Concord   Contracting Co.

End user: Egyptian Armed Forces Engineering Authority (EAFEA)

– Design & supply of water hammering system for strategic tanks pumping stations, new capital – Tabarak Contracting Co.   

End user: New Urban Communities Authority (NUCA).

 – Design & supply of water hammering system for sewage pumping  stations for housing district # 3 – Tabarak Contracting Co.  

End user: New Urban Communities Authority (NUCA).

– Design, supply & erection of water hammering system for sewage auxiliary pumping stations – Quesna – Ekhwa Contracting Co.

End user: Menofeya Water & Sewage Co.  

– Design, supply & erection of water hammering system for sewage main pumping stations – Quesna – Ekhwa Contracting Co. –

End user:  Menofeya Water & Sewage Co.

– Design, supply & erection of water hammering system for sewage main pumping stations #1 and main line DN 1000 to STP – Quos – MSMK Contracting Co. –

End user: Qena Water & Sewage Co.

– Design, supply & erection of water hammering system for intermediate tank – 6 October city – Consortium of Orascom & Hassan Allam contracting Co.

End user: New Urban Communities Authority.

 – Design, supply & erection of water hammering system for social housing project – 6 October – Consortium of Orascom & Hassan Allam contracting Co.

End user: New Urban Communities Authority.

 – Study & Design of water hammering system for 15 May City booster pumping station – Samcreet Contracting Co.

End user: New Urban Communities Authority.

– Erection of water hammering system, Hikestep project – Cairo Contracting Co.

 – Study & Design of water hammering system for New Giza project – Tabarak Contracting Co. 

Erection

– Erection, tests & hand-over for electromechanical work for Main Haram sewage  pumping station – Khedr Contracting Co. – End User:  Giza Water Co. 

 – Erection, tests & hand-over for electromechanical work for villages beside Rahawy drainage Saudia village – Giza governorate – Concord Contracting Co.

 – Erection, tests & hand-over for electromechanical work for villages beside Rahawy drainage Matania village – Giza governorate – Concord Contracting Co.

 – Erection, tests & hand-over for electromechanical work for villages beside Rahawy drainage Lesht village – Giza governorate – Concord Contracting Co.

 – Erection, tests & hand-over for electromechanical work for villages beside Rahawy drainage Abo Abbas # 2 village – Giza governorate – Concord Contracting Co.

 – Erection, tests & hand-over for electromechanical work for villages beside Rahawy drainage Kafr Shehata village – Giza governorate – Concord Contracting Co.

 –  Erection, for electromechanical work for Nekla village sewage pumping station – Qalyobeya governorate.

– Erection, for electromechanical work for Ahnasia sewage pumping station # 2 – Beni suef – Alshark Alawsat Contracting Co.

 

Pipes & Steel Fabrication

– Supplying of steel pipe DN 800 for intermediate tank – 6 October city – Consortium of Orascom & Hassan Allam contracting Co.

End user: New Urban Communities Authority.

 – Supplying of steel pipes and fittings with different diameters for social tank – 6 October City – Consortium of Orascom & Hassan Allam contracting Co.

End user: New Urban Communities Authority.

 – Supplying of steel pipes and fittings with different diameters – Samcreet Real Estate Co.

 – Supplying of seamless & ERW steel pipes DN 800 – 1000 – Engineering Cont. Co.

 – Supplying of seamless & ERW steel pipes DN 600 – Zarayed sewage pumping station – Suez – Khedr Cont. Co.

 – Supplying of steel pipes DN 250 – 400 – Military Production Authority – Narsh sewage pumping station – Giza

 

Design & Shop Drawings

 

– Preparation of shop drawings for electromechanical work for Narsh sewage pumping station – Military Production Authority – Giza

 – Preparation of shop drawings for mechanical work for Akwaz, Fahmeyeen & Tal Hammad ,  sewage pumping station – Saff – Giza – Qaha factory

 – Preparation of shop drawings for mechanical work for Kom Qanater main and auxiliary sewage pumping station – Arab Contractors