{"id":7922,"date":"2017-09-14T13:29:43","date_gmt":"2017-09-14T13:29:43","guid":{"rendered":"http:\/\/mason.misr9.com\/?page_id=7922"},"modified":"2021-02-22T10:39:27","modified_gmt":"2021-02-22T10:39:27","slug":"projects","status":"publish","type":"page","link":"https:\/\/upe-egypt.com\/index.php\/projects\/","title":{"rendered":"Projects"},"content":{"rendered":"<h3><strong><span style=\"color: #0000ff;\">Pumps<\/span> <\/strong><\/h3>\n<hr \/>\n<p style=\"padding-left: 40px;\"><strong>&#8211; Supplying QTY (04) multistage pumps 400 m\u00b3\/hr @ 25 m \u2013 Egyptian iron &amp; steel company<\/strong><br \/>\n<strong>&#8211; Supplying QTY (06) horizontal split case pumps \u2013 620 L\/s @c112 m \u2013 Fine Peak Co.<\/strong><br \/>\n<strong>&#8211; Supplying QTY (04) horizontal split case pumps 500 m\u00b3\/hr @ 60 m \u2013 Port Said Sea Port Authority.<\/strong><br \/>\n<strong>&#8211; Supplying QTY (03) horizontal split case pumps 300 m\u00b3\/hr @ 30 m \u2013 Port Said Sea Port Authority<\/strong><br \/>\n<strong>&#8211; Supplying QTY (04) vertical direct coupled sewage pumps 25 L\/s @ 40 m \u2013 Khedr Contracting Co.<\/strong><br \/>\n<strong>&#8211; Supplying QTY (03) vertical direct coupled sewage pumps 400 L\/s @ 20 m &#8211; Main Haram sewage pumping station \u2013 Khedr Contracting Co. \u2013 End User: Giza Water Co. <\/strong><br \/>\n<strong>&#8211; Supplying &amp; erection supervision of main pumps &amp; motors for Atfeeh WTP \u2013 phase 2 \u2013 Arab contracting Co. with Construction Authority of potable water (CAPW) &#8211; End User: Giza Water Co., consists of:<\/strong><br \/>\n<strong>QTY (02) Horizontal end suction pumps 400 L\/s @ 15 m <\/strong><br \/>\n<strong>QTY (02) Horizontal split case pumps 400 L\/s @ 75 m<\/strong><br \/>\n<strong>QTY (02) Vertical sludge pumps 200 L\/s @ 20 m<\/strong><\/p>\n<p style=\"padding-left: 40px;\"><strong>&#8211; Supplying &amp; erection supervision of main pumps &amp; motors for West Assuit \/ Nasser City WTP new intake &amp; booster pumping station \u2013 Hassan Allam Construction Co. \u2013 End user: New Urban Communities Authority (NUCA).<\/strong><\/p>\n<h3><span style=\"color: #0000ff;\"><strong>Water Hammering System<\/strong><\/span><\/h3>\n<hr style=\"padding-left: 40px;\" \/>\n<p style=\"padding-left: 40px;\"><strong>&#8211; Design, supply &amp; erection of water hammering system for New Cairo Irrigation and transmission lines DN 1500 \u2013 18 km , QTY (08) Tanks &#8211; 70 m\u00b3\u00a0 capacity each\u00a0 &#8211; Petrojet\u00a0 Co. &#8211;\u00a0 <\/strong><\/p>\n<p style=\"padding-left: 40px;\"><strong>End user: New Urban Communities Authority.<\/strong><\/p>\n<p style=\"padding-left: 40px;\"><strong>&#8211; Design, supply &amp; erection of water hammering system for booster pumping station Galala # 3 \u2013 Cairo Contracting Co. <\/strong><\/p>\n<p style=\"padding-left: 40px;\"><strong>\u00a0End user: Egyptian Armed Forces Engineering Authority (EAFEA)<\/strong><\/p>\n<p style=\"padding-left: 40px;\"><strong>\u00a0<\/strong><strong>&#8211; Design, supply &amp; erection of water hammering system for WTP Galala # 1 \u2013 Concord\u00a0\u00a0 Contracting Co. <\/strong><\/p>\n<p style=\"padding-left: 40px;\"><strong>End user: Egyptian Armed Forces Engineering Authority (EAFEA)<\/strong><\/p>\n<p style=\"padding-left: 40px;\"><strong>&#8211; Design, supply &amp; erection of water hammering system for booster pumping station Galala # 2 \u2013 Concord\u00a0\u00a0 Contracting Co. <\/strong><\/p>\n<p style=\"padding-left: 40px;\"><strong>End user: Egyptian Armed Forces Engineering Authority (EAFEA)<\/strong><strong>\u00a0<\/strong><\/p>\n<p style=\"padding-left: 40px;\"><strong>&#8211; Design, supply &amp; erection of water hammering system for sewage pumping station Galala # 3 \u2013 Concord\u00a0\u00a0 Contracting Co. <\/strong><\/p>\n<p style=\"padding-left: 40px;\"><strong>End user: Egyptian Armed Forces Engineering Authority (EAFEA)<\/strong><\/p>\n<p style=\"padding-left: 40px;\"><strong>&#8211; Design &amp; supply of water hammering system for strategic tanks pumping stations, new capital \u2013 Tabarak Contracting Co. \u00a0\u00a0<\/strong><\/p>\n<p style=\"padding-left: 40px;\"><strong>End user: New Urban Communities Authority (NUCA).<\/strong><\/p>\n<p style=\"padding-left: 40px;\"><strong>\u00a0<\/strong><strong>&#8211; Design &amp; supply of water hammering system for sewage pumping\u00a0 stations for housing district # 3 \u2013 Tabarak Contracting Co. \u00a0<\/strong><\/p>\n<p style=\"padding-left: 40px;\"><strong>End user: New Urban Communities Authority (NUCA).<\/strong><\/p>\n<p style=\"padding-left: 40px;\"><strong>&#8211; Design, supply &amp; erection of water hammering system for sewage auxiliary pumping stations \u2013 Quesna \u2013 Ekhwa Contracting Co. <\/strong><\/p>\n<p style=\"padding-left: 40px;\"><strong>End user: Menofeya Water &amp; Sewage Co. <\/strong><strong>\u00a0<\/strong><\/p>\n<p style=\"padding-left: 40px;\"><strong>&#8211; Design, supply &amp; erection of water hammering system for sewage main pumping stations \u2013 Quesna \u2013 Ekhwa Contracting Co. \u2013 <\/strong><\/p>\n<p style=\"padding-left: 40px;\"><strong>End user:\u00a0 Menofeya Water &amp; Sewage Co. <\/strong><\/p>\n<p style=\"padding-left: 40px;\"><strong>&#8211; Design, supply &amp; erection of water hammering system for sewage main pumping stations #1 and main line DN 1000 to STP \u2013 Quos \u2013 MSMK Contracting Co. \u2013 <\/strong><\/p>\n<p style=\"padding-left: 40px;\"><strong>End user: Qena Water &amp; Sewage Co. <\/strong><\/p>\n<p style=\"padding-left: 40px;\"><strong>&#8211; Design, supply &amp; erection of water hammering system for intermediate tank \u2013 6 October city \u2013 Consortium of Orascom &amp; Hassan Allam contracting Co. <\/strong><\/p>\n<p style=\"padding-left: 40px;\"><strong>End user: New Urban Communities Authority.<\/strong><\/p>\n<p style=\"padding-left: 40px;\"><strong>\u00a0<\/strong><strong>&#8211; Design, supply &amp; erection of water hammering system for social housing project \u2013 6 October &#8211; Consortium of Orascom &amp; Hassan Allam contracting Co. <\/strong><\/p>\n<p style=\"padding-left: 40px;\"><strong>End user: New Urban Communities Authority.<\/strong><\/p>\n<p style=\"padding-left: 40px;\"><strong>\u00a0<\/strong><strong>&#8211; Study &amp; Design of water hammering system for 15 May City booster pumping station \u2013 Samcreet Contracting Co. <\/strong><\/p>\n<p style=\"padding-left: 40px;\"><strong>End user: New Urban Communities Authority.<\/strong><\/p>\n<p style=\"padding-left: 40px;\"><strong>&#8211; Erection of water hammering system, Hikestep project &#8211; Cairo Contracting Co. <\/strong><\/p>\n<p style=\"padding-left: 40px;\"><strong>\u00a0&#8211; Study &amp; Design of water hammering system for New Giza project &#8211; Tabarak Contracting Co.\u00a0<\/strong><\/p>\n<h3><span style=\"color: #0000ff;\"><strong>Erection<\/strong><\/span><\/h3>\n<p style=\"padding-left: 40px;\"><strong>&#8211; Erection, tests &amp; hand-over for electromechanical work for Main Haram sewage\u00a0 pumping station \u2013 Khedr Contracting Co. \u2013 End User:\u00a0 Giza Water Co.\u00a0 <\/strong><\/p>\n<p style=\"padding-left: 40px;\"><strong><u>\u00a0<\/u><\/strong><strong>&#8211; Erection, tests &amp; hand-over for electromechanical work for villages beside Rahawy drainage Saudia village \u2013 Giza governorate &#8211; Concord Contracting Co.<\/strong><\/p>\n<p style=\"padding-left: 40px;\"><strong>\u00a0<\/strong><strong>&#8211; Erection, tests &amp; hand-over for electromechanical work for villages beside Rahawy drainage Matania village \u2013 Giza governorate &#8211; Concord Contracting Co.<\/strong><\/p>\n<p style=\"padding-left: 40px;\"><strong>\u00a0<\/strong><strong>&#8211; Erection, tests &amp; hand-over for electromechanical work for villages beside Rahawy drainage Lesht village \u2013 Giza governorate &#8211; Concord Contracting Co.<\/strong><\/p>\n<p style=\"padding-left: 40px;\"><strong>\u00a0<\/strong><strong>&#8211; Erection, tests &amp; hand-over for electromechanical work for villages beside Rahawy drainage Abo Abbas # 2 village \u2013 Giza governorate &#8211; Concord Contracting Co.<\/strong><\/p>\n<p style=\"padding-left: 40px;\"><strong>\u00a0<\/strong><strong>&#8211; Erection, tests &amp; hand-over for electromechanical work for villages beside Rahawy drainage Kafr Shehata village \u2013 Giza governorate &#8211; Concord Contracting Co.<\/strong><\/p>\n<p style=\"padding-left: 40px;\"><strong>\u00a0<\/strong><strong>&#8211;\u00a0 Erection, for electromechanical work for Nekla village sewage pumping station \u2013 Qalyobeya governorate.<\/strong><\/p>\n<p style=\"padding-left: 40px;\"><strong>&#8211; Erection, for electromechanical work for Ahnasia sewage pumping station # 2 \u2013 Beni suef \u2013 Alshark Alawsat Contracting Co.<\/strong><\/p>\n<p style=\"padding-left: 40px;\"><strong>\u00a0<\/strong><\/p>\n<h3><strong><span style=\"color: #0000ff;\">Pipes &amp; Steel Fabrication<\/span> <\/strong><\/h3>\n<p style=\"padding-left: 40px;\"><strong>&#8211; Supplying of steel pipe DN 800 for intermediate tank \u2013 6 October city \u2013 Consortium of Orascom &amp; Hassan Allam contracting Co. <\/strong><\/p>\n<p style=\"padding-left: 40px;\"><strong>End user: New Urban Communities Authority.<\/strong><\/p>\n<p style=\"padding-left: 40px;\"><strong>\u00a0<\/strong><strong>&#8211; Supplying of steel pipes and fittings with different diameters for social tank \u2013 6 October City \u2013 Consortium of Orascom &amp; Hassan Allam contracting Co. <\/strong><\/p>\n<p style=\"padding-left: 40px;\"><strong>End user: New Urban Communities Authority.<\/strong><\/p>\n<p style=\"padding-left: 40px;\"><strong>\u00a0<\/strong><strong>&#8211; Supplying of steel pipes and fittings with different diameters \u2013 Samcreet Real Estate Co.<\/strong><\/p>\n<p style=\"padding-left: 40px;\"><strong>\u00a0<\/strong><strong>&#8211; Supplying of seamless &amp; ERW steel pipes DN 800 \u2013 1000 \u2013 Engineering Cont. Co. <\/strong><\/p>\n<p style=\"padding-left: 40px;\"><strong>\u00a0<\/strong><strong>&#8211; Supplying of seamless &amp; ERW steel pipes DN 600 \u2013 Zarayed sewage pumping station \u2013 Suez \u2013 Khedr Cont. Co.<\/strong><\/p>\n<p style=\"padding-left: 40px;\"><strong>\u00a0<\/strong><strong>&#8211; Supplying of steel pipes DN 250 \u2013 400 &#8211; Military Production Authority \u2013 Narsh sewage pumping station &#8211; Giza<\/strong><\/p>\n<p style=\"padding-left: 40px;\"><strong>\u00a0<\/strong><\/p>\n<h3><span style=\"color: #0000ff;\"><strong>Design &amp; Shop Drawings<\/strong><\/span><\/h3>\n<p style=\"padding-left: 40px;\"><strong>\u00a0<\/strong><\/p>\n<p style=\"padding-left: 40px;\"><strong>&#8211; Preparation of shop drawings for electromechanical work for Narsh sewage pumping station \u2013 Military Production Authority \u2013 Giza<\/strong><\/p>\n<p style=\"padding-left: 40px;\"><strong>\u00a0<\/strong><strong>&#8211; Preparation of shop drawings for mechanical work for Akwaz, Fahmeyeen &amp; Tal Hammad ,\u00a0 sewage pumping station \u2013 Saff \u2013 Giza \u2013 Qaha factory <\/strong><\/p>\n<p style=\"padding-left: 40px;\"><strong>\u00a0<\/strong><strong>&#8211; Preparation of shop drawings for mechanical work for Kom Qanater main and auxiliary sewage pumping station \u2013 Arab Contractors\u00a0 <\/strong><\/p>\n<p style=\"padding-left: 40px;\">\n","protected":false},"excerpt":{"rendered":"<p>Pumps &#8211; Supplying QTY (04) multistage pumps 400 m\u00b3\/hr @ 25 m \u2013 Egyptian iron &amp; steel company &#8211; Supplying QTY (06) horizontal split case pumps \u2013 620 L\/s @c112 m \u2013 Fine Peak Co. &#8211; Supplying QTY (04) horizontal split case pumps 500 m\u00b3\/hr @ 60 m \u2013 Port Said Sea Port Authority. &#8211; [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-7922","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/upe-egypt.com\/index.php\/wp-json\/wp\/v2\/pages\/7922","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/upe-egypt.com\/index.php\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/upe-egypt.com\/index.php\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/upe-egypt.com\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/upe-egypt.com\/index.php\/wp-json\/wp\/v2\/comments?post=7922"}],"version-history":[{"count":13,"href":"https:\/\/upe-egypt.com\/index.php\/wp-json\/wp\/v2\/pages\/7922\/revisions"}],"predecessor-version":[{"id":8173,"href":"https:\/\/upe-egypt.com\/index.php\/wp-json\/wp\/v2\/pages\/7922\/revisions\/8173"}],"wp:attachment":[{"href":"https:\/\/upe-egypt.com\/index.php\/wp-json\/wp\/v2\/media?parent=7922"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}